There is an electrical device, its testing environment and the functionality of its various parts.
o The device is a part of a Radar system.
o The Radar system works with 4 channels.
o The Radar system has a controller unit that selects which channel will be used, it then transfers this information to the device.
o The received channel input is also transferred into the device.
o Acceptance tests are used at the end of the production line. In case the acceptance tests fail, troubleshooting is performed by selecting acceptance or diagnostic tests.
o In the field, the troubleshooting starts by reporting a symptom such as:
No reception on channels 1 and 2, or
No reception on channels 3 and 4.
The troubleshooting is performed by running diagnostic tests, to isolate the faulty assembly.
1. What is the minimal set of tests that will verify the overall functionality of the device?
2. What tests should be defined to isolate all potential faulty components?
ראיון טלפוני שלאחריו בעל סינון ראשני שלאחריו אחרי כמה ימים מודיעים אם אתה ממשיך הלאה וקובעים לך ראיון בזום.
שאלות מתוך הראיון
התנהלות לא נעימה לדעתי.
לאחר שעברתי את הראיון הטלפוני עםהHR קיבלתי שיבוץ לראיון בזום עם המנהל פיתוח. קיבלתי בערך שבוע ללמוד אליו ותוך כדי יומיים לפני הראיון קיבלתי שיחת טלפון מHR שממשיכים עם מועמדים אחרים ונאלצים לשים אותי על Hold. מה זה היחס הבזיוני הזה? נותנים לי שבוע שבו אני לומד לראיון ומודיעים שלי שהתקדמו עם מועמדים אחרים מבלי שראיינו אותי? תחשבו בעצמם אם הייתם רוצים לעבוד במקום כזה
תשובות
הוסף תשובה
|
לצפיה בתשובות
נובמבר 2020
שאלה לא קשורה איך הגעת לחברה דרך מודעת דרושים ? או מישהו מפנים
נובמבר 2020
ראיתי את המשרה דרך האתר שלהם ושלחתי לאחד העובדים שיעבירו
1
פנדו (הייטק)
35 עובדים
משרדים ראשיים: יקום
החברה מפתחת פלטפורמה שעוזרת למנהלים פרוייקטים לבצע שינויים באפליקציות מובייל ללא צורך בפיתוח קוד.